Projects
Here are some of our current/past projects:
Elevator Pit Excavation
Verticon was chosen to Excavate an elevator pit to gain lower level access in a downtown Baltimore commercial building.
Generator Installation for Arlington County
Arlington County required a new 350KW Natural Gas Generator for a recently purchased building destined to become a solution to Arlington County's need for the homeless in the county. Verticon Inc. and ABS Electrical was chosen to provide a turnkey installation. The old generator was removed. A new steel platform was erected onto the roof to support the new generator. A new 350 KW MTU natural gas generator was installed on roof. The installation included new isolation bypass switches, panels, conduit, feeders, and control wiring. Verticon upgraded the gas service to provide the proper pressures to the new generator.
repairs to Stainless steel hinge brackets
A Washington DC based commercial "Class A" building owner was faced with breaking hinge brackets and shattered restroom stall doors. Verticon Inc. was chosen to weld 400 stainless steel hinges to secure the heavy glass panels to the hinges and eliminate the risk to their tenants. Verticon Inc. was able to come in after hours and quickly provide the repairs.
HVAC, Electrical, life safety renovation in DC
Verticon Inc. was chosen to provide a turn key installation for HVAC, Bathroom, Electrical, Fire Alarm, and Controls inside a Federal Government Facility located in Washington DC.
Restroom drain install
A General Contractor chose Verticon Inc. to demo tile floors and sections of walls for 12 new square floor drains. Verticon Inc. finished new concrete and set matching tile and grout. Drywall was finished and painted. Work was done quickly in a workmanlike manner and did not interfere with the facility day to day operations.